Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 19 of 39 First Page ... 15 16 17 18 19 20 21 22 23 ... Last Page
Posts 181 - 190 of 383
Local Name:
وين المرجان
Budget:
$5.1B
Announced:
25 Jan 2022
Construction Start:
2023
Opening:
2027
Area:
63 ha
Developer:
Marjan,
RAK Hospitality Holding,
Operator:
Consultants:
Designers:
Ride Suppliers:
  1. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,380

  2. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292


  3. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292
    It is confirmed that Wynn Al Marjan island will feature 2 retail areas, Parterre shops and Ocean Promenade

  4. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292
    Potential Cabinet Suppliers for the Gaming Floor at Wynn Al Marjan Island

    - Aristocrat Gaming Technologies
    - Konami Gaming
    - IGT Global Services

    These gaming-related vendors have all been licensed by the GCGRA, allowing them to supply their products and services to gaming operators.

  5. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292
    Wynn executives confirm the first boutique will open at Wynn Al Marjan Island's Parterre Shops.

    It has been reported that there is high demand for retail space at Wynn's new resort. Rolex has been mentioned as a retailer expected to open a store at the resort.

  6. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292








  7. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292

  8. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292


    Wynn Al Marjan Island's tower has just over 10 floors remaining, bringing the tower to 82% completion. The structure's core is well above the 60th floor, and based on the current progress, topping off is expected in late October.

  9. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    292
    IGY Marinas has been appointed as the official marina operator for the upcoming Wynn Al Marjan Island Marina, located in Ras Al Khaimah, United Arab Emirates.

    The agreement will see IGY Marinas provide pre-opening consultancy and post-opening operational and marketing services for the new waterfront facility. The marina, which forms part of the highly anticipated Wynn Al Marjan Island integrated resort, is being developed by Wynn Resorts in collaboration with Marina Solutions International (MSI).

    Designed to accommodate yachts up to 85 metres in length, the marina will feature 101 berths and is set to meet the growing demand for high-end superyacht facilities in the region. According to IGY, the facility will be built to international standards, with advanced berthing systems and premium marine services designed to deliver a luxury experience for visiting yachts and their guests.

    "Our involvement in the Wynn Al Marjan Island project represents a significant milestone for IGY Marinas,” commented Steve English, CEO of IGY Marinas. “We are excited to build on our existing presence in marina management in the Middle East and contribute to the creation of a world-class destination for yachting and gaming enthusiasts.
    https://www.superyachttimes.com/yacht-news/wynn-al-marjan-island-marina-operator-igy-marinas

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts

resortX and themeparX are neutral, user-powered, and staff-moderated platforms that provide both aggregated and original news updates on theme park and resort projects worldwide. We are not affiliated with the owners or developers of the projects listed and receive no compensation from them.