Local Name:
وين المرجان
Budget:
$5.1B
Announced:
25 Jan 2022
Construction Start:
2023
Opening:
2027
Area:
63 ha
Developer:
Marjan,
RAK Hospitality Holding,
Operator:
Consultants:
Designers:
Ride Suppliers:
  1. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,358

  2. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284
    Quote Originally Posted by Guest View Post
    Exciting, where did you hear this?
    https://www.hoteliermiddleeast.com/business/encore-al-marjan-wynn

  3. Exciting, where did you hear this?

  4. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284


    Note - this is only a concept logo.

    Encore at Wynn Al Marjan Island confirmed. Encore at Wynn AMI could be integrated into the current Wynn tower as Encore Tower Suites, or it could potentially be Encore Wynn Marina, but we still don't know this hotel's form yet. It's confirmed and expected to open in the early 2030s.

  5. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284


  6. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284
    Confirmed, Wynn Al Marjan Island's tower has currently reached the 53rd floor, while walls are extending up to the 56th floor, leaving the tower with 17 floors left. Also, floor 63 will be the last floor housing normal rooms, for floors 64–68 will use a high floor-to-ceiling technique exclusively for tower suites similar to the ones on 31–33, and floor 69 is said to be a sky observatory. We still don't know what floor 70 will house.

  7. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284


    It is said that Wynn Al Marjan Island's tower will be structurally topped off in the second week of October. However, the glass façade, the spire, and the Wynn logo will not be installed at that point. That work is estimated to take 1.5 months to complete, which brings us to early December, the expected time for the architectural top-off. Also, during my recent visit to the site, signs had been placed along the E11, directing future guests to the resort. Soon, construction of a bridge directly connecting Island 3 and mainland Ras Al Khaimah is expected to begin, potentially as early as next month. Additionally, landscaping work for the beachfront and poolscape of Wynn Al Marjan Island is currently underway along Al Duhaisah Road, and is more than halfway complete.

  8. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284


    The glass façade reflecting the sunset looks better than on the rendition.

  9. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284


  10. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    284

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts

resortX and themeparX are neutral, user-powered, and staff-moderated platforms that provide both aggregated and original news updates on theme park and resort projects worldwide. We are not affiliated with the owners or developers of the projects listed and receive no compensation from them.