Send your construction pics to content_at_themeparxdotcom

Saadiyat Island
Views: 86,099

Post an Update
Page 1 of 13 1 2 3 4 5 ... Last Page
Posts 1 - 10 of 123
Local Name:
جزيرة السعديات
Budget:
$27B
Announced:
2007
Construction Start:
Opening:
Area:
2700 ha
Operator:
Consultants:
Ride Suppliers:
  1. Does anyone know what's being built here?
    24.5411141, 54.4275875

  2. Teodora is offline Resort Investigator
    Join Date
    Nov 2023
    Posts
    4
    Zayed National Museum Construction Progress







  3. Vladislava is offline Curious Chap
    Join Date
    Nov 2023
    Posts
    2
    Abu Dhabi real estate: Saadiyat Island tops chart for rental yield, capital gains for Q3 2023. It has the highest annual capital gains with villa prices rising 10.3% and apartment prices 4.7% according to a ValuStrat study for Q3 2023




    Source: https://www.arabianbusiness.com/industries/real-estate/abu-dhabi-real-estate-saadiyat-island-tops-chart-for-rental-yield-capital-gains-for-q3-2023

  4. Nobu Residences
    2027






  5. dyndiii123 is offline Curious Chap
    Join Date
    Oct 2023
    Posts
    3
    ASGC is the main contractor for the Grove project at Saadiyat Island in Abu Dhabi by Aldar Properties



    ASGC is the main contractor for the Grove project at Saadiyat Island in Abu Dhabi by Aldar Properties. The mixed-use development comprises residential homes and retail outlets offering comprehensive community living, enhancing how people live, stay, shop and play.

    ASGC executes construction works for the substructure work package, including two basements and a lower ground floor. In addition, ASGC provides Design & Build services for the superstructure package, comprising an upper ground floor, five (UG+10 floors) residential and retail mixed-use buildings, town square & cinema block (UG+6 floors) and other retail areas. Our additional scope consists of landscaping, utilities, MEP, and infrastructure works.
    Source: https://www.asgcgroup.com/projects/residential/the-grove

  6. Aldar Properties, a prominent real estate developer in Abu Dhabi, has introduced The Source II, an innovative wellness-inspired property. The company anticipates that the project will be ready for handover by the year 2026.





    source: https://www.arabianbusiness.com/industries/real-estate/abu-dhabi-real-estate-aldar-launches-the-source-ii-expects-2026-handover

  7. Quote Originally Posted by Neverland View Post
    According to this article posted last month, Zaha Hadid’s building was abandoned and replaced with what is now being built on its site: Teamlab Phenomena Abu Dhabi.

    https://www.dezeen.com/2022/06/24/teamlab-phenomena-abu-dhabi-saadiyat-island/amp/
    Not sure how accurate that is. TeamLab Phenomena and National History Museum are being built next to each other as seen in the link below. This image is from February this year. I can't see any later images.

    https://livingatlas.arcgis.com/wayback/#active=25982&ext=54.40174,24.52584,54.40512,24.53278&localChangesOnly=true

  8. Neverland is offline Resort Investigator
    Join Date
    Jul 2023
    Posts
    4
    According to this article posted last month, Zaha Hadid’s building was abandoned and replaced with what is now being built on its site: Teamlab Phenomena Abu Dhabi.

    https://www.dezeen.com/2022/06/24/teamlab-phenomena-abu-dhabi-saadiyat-island/amp/

Page 1 of 13 1 2 3 4 5 ... Last Page

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts