Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 2 of 15 First Page 1 2 3 4 5 6 Last Page
Posts 11 - 20 of 142
Local Name:
وين المرجان
Budget:
$5.1B
Announced:
25 Jan 2022
Construction Start:
2023
Opening:
2027
Area:
63 ha
Developer:
Marjan, RAK Hospitality Holding, Wynn Resorts
Operator:
Consultants:
Designers:
Ride Suppliers:
  1. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85



  2. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85

  3. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85

  4. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85
    Ascending 305 meters above the sea, the 70-story hotel tower has been designed by the award winning team of Wynn Design and Development architects, designers, and creatives spanning over 60 hectares of land. Elegant design details that have become essential to the Wynn experience will be showcased throughout Wynn Al Marjan Island: floor-to-ceiling windows that emphasize natural light in every room, suite, and villa; airy, garden-like environments in public spaces; and a variety of impressively designed restaurants and upscale boutiques. Uniquely designed for Wynn Al Marjan Island, the Hotel Tower will offer 360-degree waterfront views. the main tower's walls have exceeded the 47th floor while the tower has reached the 45th floor at 200 meters (655 feet) in height.

  5. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85

  6. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85

  7. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85


  8. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85
    As Craig Billings mentioned in this video they have completed 42 out 70 which is exactly 60% how come is 26 floors 55% of the tower
    https://www.youtube.com/watch?v=gTxN6n4WQuQ

  9. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85
    I can confirm that the structure has reached floor 40 out of the 55 that it will have when completed which puts the structure at a 72% completion, also the structure currently stands just above the 200 meter mark. as seen in the photo updates floor 38 and 39 have a noticeable height difference compared to the rest of the floors and allegedly could be and an all tower suites floors with high floor to floor or even a 2 floor apartment suite which will feature 3 rooms like the ones seen at Wynn Las Vegas and nothing is confirmed.

  10. AALTJ is offline resortX Top Investigator
    Join Date
    Aug 2024
    Posts
    85


Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts