Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 1 of 2 1 2 Last Page
Posts 1 - 10 of 16
Local Name:
Budget:
$10B
Announced:
2013
Construction Start:
Opening:
2030
Location:
Area:
1080 ha
Developer:
Operator:
Consultants:
Designers:
Contractors:
Ride Suppliers:
Other Suppliers:
  1. TCK Lana is offline resortX Top Investigator
    Join Date
    Feb 2025
    Posts
    70
    Now, construction is officially beginning on what will be one of the most complex infrastructure projects in Singapore’s history. Spanning 1,080 hectares worth of land, almost the size of Changi Airport today, T5 is, in many ways, building an entirely new airport.






    Source: https://nowboarding.changiairport.com/discover-changi/first-look-at-changi-airport-terminal-5-key-features.html

  2. TCK Lana is offline resortX Top Investigator
    Join Date
    Feb 2025
    Posts
    70
    SINGAPORE – Prime Minister Lawrence Wong has broken ground on Changi Airport Terminal 5 (T5), an expansion project more than a decade in the making that will position the airport to ride an expected surge in air travel within the Asia-Pacific and beyond.

    With the May 14 ground-breaking, work on the mega terminal has begun, several years after the project was paused owing to the Covid-19 pandemic.




    Source: https://www.straitstimes.com/singapore/transport/pm-wong-breaks-ground-on-changi-airport-t5-all-sia-scoot-flights-will-move-there-when-it-opens

  3. TCK Lana is offline resortX Top Investigator
    Join Date
    Feb 2025
    Posts
    70





  4. Olga8 is offline Curious Chap
    Join Date
    Mar 2023
    Posts
    3
    Construction of Terminal 5 at Changi Airport, Singapore, is expected to begin in 2025, the government of Singapore has announced.

    Source: https://www.airport-technology.com/news/changi-airport-singapore/

  5. Since this Singapore, they already found an abbreviation for their yet-to-be-built new urban district. CEUD. Nice.

  6. MarkEm is offline resortX Top Investigator
    Join Date
    Nov 2020
    Posts
    550


    Singapore Changi Terminal 5 is expected to open in the mid-2030s, and will be a new mega-terminal at the airport. Terminal 5 will have the capacity to serve 50 million passengers per year, more than the capacity of Terminal 1 and Terminal 3 combined.
    Since we’re talking about Singapore here, the new terminal won’t just be a destination for people who are flying. The development will also include the construction of the new Changi East Urban District (CEUD), which will be a business and lifestyle destination. I guess we should expect something along the lines of The Jewel.


    Source: https://onemileatatime.com/news/singapore-changi-terminal-5/

  7. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,185



    Terminal 5 (T5) will be located within the 1,080-hectare Changi East development, and will be able to handle about 50 million passenger movements per year. T5 will be designed with the flexibility to be built in two phases, in line with traffic growth, and is expected to be operational around the mid-2030s. It will secure Singapore’s capacity to ride on the long-term growth of aviation, strengthening Changi Airport’s position as a premier air hub for the region and beyond, and ensuring that future generations of Singaporeans can continue to benefit from Changi’s global connectivity.

    T5 will reinforce Changi Airport’s status as a national icon and ensure that the airport will continue to be a place of shared experiences across generations of Singaporeans, where precious memories are forged with friends and family.

    Drawing on lessons learnt from the Covid-19 pandemic, T5 has been designed with the flexibility to operate as smaller sub-terminals when needed. Specialised provisions to reduce the transmission of diseases will also be deployed in T5, including contactless systems at passenger touchpoints and enhanced ventilation systems.
    https://www.changiairport.com/corporate/our-expertise/changi-east.html


  8. MarkEm is offline resortX Top Investigator
    Join Date
    Nov 2020
    Posts
    550
    This is the most recent construction image I can find from an article in May 2022 but I am not 100% sure if that's a very recent image.



    Source: https://globalcirculate.com/work-on-changi-airport-t5-to-restart-terminal-to-be-ready-around-the-mid-2030s/amp/

  9. Any recent construction pics?

Page 1 of 2 1 2 Last Page

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts

resortX and themeparX are neutral, user-powered, and staff-moderated platforms that provide both aggregated and original news updates on theme park and resort projects worldwide. We are not affiliated with the owners or developers of the projects listed and receive no compensation from them.