Send your construction pics to content_at_themeparxdotcom

New Murabba
Views: 9,903

Post an Update
Page 2 of 2 First Page 1 2
Posts 11 - 16 of 16
Local Name:
المربع الجديد
Budget:
Announced:
16 Feb 2023
Construction Start:
Opening:
2030
Area:
1900 ha
Developer:
New Murabba Development Company
Operator:
Designers:
Ride Suppliers:
Other Suppliers:
  1. HunterX is offline resortX Top Investigator
    Join Date
    Aug 2022
    Posts
    176
    China Harbour Engineering Company Wins Saudi’s New Murabba Contract
    Saudi Arabia’s New Murabba Development Company has awarded a contract to China Harbour Engineering Co. Ltd for the first phase of excavation required for the future construction of the basement structures underneath the Mukaab and surrounding podiums. The project’s scope also involves backfilling and enhancing the ground in the surrounding areas of development.

  2. BurningSky is offline resortX Top Investigator
    Join Date
    Jul 2023
    Posts
    198
    Saudi Arabia’s Public Investment Fund (PIF)-backed New Murabba Development Company (NMDC) has awarded a contract to set up the temporary site offices at the New Murabba site to the local contractor Saudi Real Estate Infrastructure Company (Binyah).
    Source: https://www.meed.com/contractor-secures-deal-for-new-murabba-project

  3. BurningSky is offline resortX Top Investigator
    Join Date
    Jul 2023
    Posts
    198
    Saudi-based New Murabba Development Company (NMDC) has awarded Turner Arabia, a leading construction management consultancy, with a significant contract to oversee project management services for its ambitious development, The Mukaab, located centrally in New Murabba, Riyadh.
    Recently, NMDC also signed an agreement with Bechtel Corporation for project management services for the masterplan and site-wide infrastructure for New Murabba.
    The agreement was signed by Sabah Barakat, the Acting CEO of New Murabba Development Company, and Jacob Mumm, Senior Vice President and Regional President at Bechtel.
    Source: https://www.constructionweekonline.com/projects-tenders/saudi-arabia-new-murabba-awards-major-contracts-to-turner-arabia-bechtel

  4. MarkEm is offline resortX Top Investigator
    Join Date
    Nov 2020
    Posts
    507
    The New Murabba Company, the developer behind the world’s largest modern downtown, has signed an agreement with Bechtel Corporation for Project Management Services for the masterplan and site-wide infrastructure.
    Source: https://www.hoteliermiddleeast.com/saudi-arabia/saudi-arabias-new-murabba-signs-major-deal-to-reach-its-completion

  5. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,122




    His Royal Highness Crown Prince Mohammad bin Salman bin Abdulaziz, Prime Minister and Chairman of the New Murabba Development Company (NMDC), announced today the launch of the New Murabba Development Company which aims to develop the world’s largest modern downtown in Riyadh, contributing to the city’s future development in line with Saudi Vision 2030.

    The New Murabba project will be built around the concept of sustainability, featuring green areas and walking and cycling paths that will enhance the quality of life by promoting healthy, active lifestyles and community activities. It will also feature an iconic museum, a technology and design university, a multipurpose immersive theater, and more than 80 entertainment and culture venues.

    The project will be situated at the intersection of King Salman and King Khalid roads to the North West of Riyadh, over an area of 19 square kilometers, to accommodate hundreds of thousands of residents. The project will offer more than 25 million sqm of floor area, featuring more than 104,000 residential units, 9,000 hotel rooms, and more than 980,000 sqm of retail space, as well as 1.4 million sqm of office space, 620,000 sqm of leisure assets, and 1.8 million sqm of space dedicated to community facilities.

    The New Murabba project will offer a unique living, working and entertainment experience within a 15-minute walking radius and will have its own internal transport system. It will be approximately 20-minutes drive from the airport.

    NMDC will develop the project and build the “Mukaab”, an exceptional iconic landmark featuring the latest innovative technologies. The design of the “Mukaab” includes first-of-its-kind facilities and will be one of the largest built structures in the world, standing 400m high, 400m wide, and 400m long. The cubic shape of the “Mukaab” will ensure the ultimate utilization of space to accommodate the technologies necessary to develop the icon.

    Inspired by the modern Najdi architectural style, the “Mukaab” will be the world’s first immersive destination offering an experience created by digital and virtual technology with the latest holographics. The “Mukaab” will encompass a tower atop a spiral base, and a structure featuring 2 million sqm of floor space that will be a premium hospitality destination with a multitude of retail, cultural and tourist attractions, along with residential and hotel units, commercial spaces, and recreational facilities.

    The launch of NMDC is part of PIF’s strategy to unlock the capabilities of promising sectors, enable the private sector and increase local content, contribute to the development of real estate projects and the local infrastructure, and diversify sources of income for the Saudi economy. It is expected to add SAR180 billion to non-oil GDP and create 334,000 direct and indirect jobs by 2030. The project is due to be completed in 2030.


  6. admin is offline Administrator
    Join Date
    May 2011
    Posts
    272

    New Murabba

    Status: Under Construction

Page 2 of 2 First Page 1 2

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts