  2. Thread: NEOM - Trojena

    Post by: GulfBuild
    Posts
    191
    Views
    345,103
    NEOM VAULT is a man-made canyon that acts as a gateway to the rest of the NEOM Trojena region. Access to The VAULT is via the 4.4 km (TTT) “Time Travel Tunnel” from the Mirage Visitor Center.
    The Mirage Freight Depot, which includes the required MEICA, will be the only highway structure connected to the Time Travel Tunnel. All logistics requirements of the rail system up to “The VAULT” will need to be facilitated through the carrying capacity of the funicular system.
    Vault excavation also includes rockfall barrier works, extra excavations and blasting excavation works, along with anchoring works for the D17 tunnel, D17 Link Tunnel and B1 tunnel support construction systems.





    Source: https://www.egimgrup.com/en/referans/LAJV---NEOM-TROJENA-PROJESI-BIM-HIZMETLERI.html
  3. Thread: Riyadh Expo 2030

    Post by: GulfBuild
    Posts
    21
    Views
    24,702


  4. Thread: NEOM - Trojena

    Post by: GulfBuild
    Posts
    191
    Views
    345,103
    Trojena has disabled its YouTube channel.

    https://www.youtube.com/@TROJENA
  5. Posts
    458
    Views
    568,120
    Jeddah Tower has reached the 95th floor.




    https://x.com/Northabhor/status/2037575266671734842/
  6. Thread: NEOM - Trojena

    Post by: GulfBuild
    Posts
    191
    Views
    345,103
    MILAN, March 25, 2026 – It is hereby announced that the client NEOM has exercised the termination for convenience regarding the construction in Trojena (Saudi Arabia) of a system of three dams designed to feed a freshwater lake, as well as the architectural structure “The Bow”.

    The termination — also exercised by the client with respect to other contractors for other works in the area — will become effective on March 29, 2026. As of that date, the works are approximately 30% complete, with a remaining project backlog for Webuild of approximately €2.8 billion.
    Source: https://www.webuildgroup.com/en/media/press-releases/update-trojena-contract-saudi-arabia-neom/
  7. Posts
    322
    Views
    566,771
  8. Thread: Riyadh Expo 2030

    Post by: GulfBuild
    Posts
    21
    Views
    24,702
  9. Thread: Diriyah Gate

    Post by: GulfBuild
    Posts
    163
    Views
    188,319
  10. Posts
    458
    Views
    568,120
  11. Posts
    458
    Views
    568,120
  12. Posts
    458
    Views
    568,120
Results 1 to 12 of 12