Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 1 of 7 1 2 3 4 5 ... Last Page
Posts 1 - 10 of 68
Budget:
$200M
Announced:
2006
Construction Start:
2011
Opening:
2026
Area:
10 ha
Developer:
BESIX Group
Operator:
Consultants:
Designers:
Gehry Partners, Adamson Associates
Contractors:
BESIX Group, Trojan General Contracting
Ride Suppliers:
Other Suppliers:
  1. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,358

  2. zw
    zw is offline resortX Top Investigator
    Join Date
    Sep 2025
    Posts
    27

  3. zw
    zw is offline resortX Top Investigator
    Join Date
    Sep 2025
    Posts
    27

  4. zw
    zw is offline resortX Top Investigator
    Join Date
    Sep 2025
    Posts
    27



  5. The Guggenheim Art Museum in Abu Dhabi, designed by Frank Gehry. Mass timber was used for the entrance, establishing itself as the largest Guggenheim museums ever built... The building is a hybrid structure, using steel, reinforced concrete, wood, and aluminum.

    Approx. 30,000 m² (≈320,000 ft²)
    The beams were made in Washington.

    Fabricated in Japan and delivered to the UAE

    60,000 holes were drilled and 4,000+ kerf cuts.



    Source: https://www.linkedin.com/posts/nic-wilson_the-guggenheim-art-museum-in-abu-dhabi-designed-activity-7446921839874015232-ivZ5/


  6. zw
    zw is offline resortX Top Investigator
    Join Date
    Sep 2025
    Posts
    27

  7. zw
    zw is offline resortX Top Investigator
    Join Date
    Sep 2025
    Posts
    27


Page 1 of 7 1 2 3 4 5 ... Last Page

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts

resortX and themeparX are neutral, user-powered, and staff-moderated platforms that provide both aggregated and original news updates on theme park and resort projects worldwide. We are not affiliated with the owners or developers of the projects listed and receive no compensation from them.