Send your construction pics to content_at_themeparxdotcom

Post an Update
Posts 1 - 7 of 7
Local Name:
فالكن سِتي أوف وندرز
Budget:
12B
Announced:
16 Feb 2005
Construction Start:
2006
Opening:
on hold
Location:
Area:
40 ha
Developer:
Link Global Group, Salem Ahmad Al Moosa Enterprises
Operator:
Link Global Group
Consultants:
Engineer Adnan Saffarini Office
Designers:
Engineer Adnan Saffarini Office, Esat Farman
Contractors:
Ride Suppliers:
Other Suppliers:
  1. SiteSeeing101 is offline Senior Park Investigator
    Join Date
    Nov 2021
    Posts
    11
    Looks like they haven't made much progress aside from the residential area:



    Source: https://www.youtube.com/watch?v=1qU1TR4eh00

    Satellite imagery of where the pyramids will be, based on the render posted previously on this thread. Only one of the 3 pyramids planned is under construction so far (image from March 2021):



    Source: Google Earth

  2. That villa wing has been sitting there for a long long time ago already, they were built some 10-15 years ago.

    What's new are the visible preparations for the SAAM Vega Pyramids Hotel. My sources tell me that that's going ahead!

  3. As of today, it is a headless falcon with a bunch of villas in his left wing.

    The rest is a desert mirage.


  4. Any recent photos showing the Eiffel Tower, Taj Arabia, Hanging Gardens of Babylon and Falconcity Mall under construction?

    Can someone drive in there and take pics?


  5. Very old project that never really took off. July 2006 image:



    Source:
    https://true-dubai.com/falcon-city-dubailand.htm

  6. admin is online now Administrator
    Join Date
    May 2011
    Posts
    205

    Falconcity of Wonders

    Status: ?

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts