Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 7 of 8 First Page ... 3 4 5 6 7 8 Last Page
Posts 61 - 70 of 74
Local Name:
Budget:
$50M
Announced:
24 Jan 2022
Construction Start:
Opening:
2025
Area:
1 ha
Operator:
Consultants:
Designers:
Contractors:
Ride Suppliers:
Other Suppliers:
  1. zeebefree is offline resortX Top Investigator
    Join Date
    Aug 2022
    Posts
    54

  2. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,116

  3. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,116





  4. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,116

  5. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,116

  6. zeebefree is offline resortX Top Investigator
    Join Date
    Aug 2022
    Posts
    54

  7. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,116
    Construction drawings reveal details of Efteling Grand Hotel
    This month, Efteling has applied for an environmental permit for the new Efteling Grand Hotel, which should open in 2024. Looopings received the detailed construction drawings for the 50 million euro complex. It shows all kinds of details that have not been shared with the public before, for example the rear facade and the precise layout of the majestic building.
    The exact location is visible on one of the building plans: on the entrance square between the parking lot and the Vonderplas, before the railway crossing. That is at the current location of La Place restaurant De Vrolijke Noot.














    Source: https://www.looopings.nl/weblog/19505/Bouwtekeningen-verraden-details-van-Efteling-Grand-Hotel.html

  8. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,116
    Demolition of the La Place restaurant on Dwarrelplein

    The Dwarrelplein had to be overhauled due to the arrival of the Efteling Grand Hotel : a 143-room themed hotel that will form the gateway to the Pardoes Promenade











    Source: https://www.looopings.nl/weblog/19952/Fotos-Efteling-restaurant-De-Vrolijke-Noot-wordt-vier-jaar-na-de-opening-gesloopt.html

  9. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,116
    Almost all of the old buildings and facilities on Dwarrelplein - the square behind the Efteling entrance House of the Five Senses - have been moved or demolished.
    Efteling plans to start work on the foundations for the Efteling Grand Hotel after the summer, a 106-metre wide hotel complex with seven floors, 143 rooms, two restaurants, two souvenir shops, a spa and a swimming pool. Hotel guests will soon look out over the Fairytale Forest and Aquanura. In total, the project will cost 50 million euros.












    Source: https://www.looopings.nl/weblog/20143/Entreegebied-Efteling-is-enorme-bouwput-nu-ook-garderobe-gesloopt.html

  10. MarkEm is offline resortX Top Investigator
    Join Date
    Nov 2020
    Posts
    481
    Eftelings new service building in the parking lot

    Due to the arrival of the Efteling Grand Hotel, that building was demolished. The dog kennel did not return. In recent months, all other facilities have been temporarily housed in the entrance building of the House of the Five Senses. Now there is permanent replacement accommodation in the parking lot. The construction site for the hotel is behind it.










    Source: https://www.looopings.nl/weblog/20399/Efteling-opent-nieuw-servicegebouw-op-parkeerplaats.html

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts