Local Name:
مشروع البحر الأحمر
Budget:
$27B
Announced:
31 Jul 2017
Construction Start:
07 Aug 2019
Opening:
2030
Area:
  1. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,018
    Shurayrah Islands Clubhouse



    https://tmrw.inc/marketing-renders/

  2. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,108
    Delighted with the construction progress we've made in the inner depths of #DesertRockResort, where we're building a 60-key hyper-luxury, eco-friendly hotel that's fully integrated into the rock. It's one of two inland resorts opening as part of phase 1 of
    @VisitRedSea
    .
    .





    The hotel is one of two inland resorts opening as part of phase one of the Red Sea Project.
    Oppenheim Architecture’s philosophy to build with the land, not on the land, is paying off at our 60-key Desert Rock resort. The architecture will be fully integrated into the rock to preserve its striking silhouette while providing guests with uninterrupted spectacular views.


    Source: https://www.thenationalnews.com/travel/hotels/2023/01/25/hyper-luxury-and-eco-friendly-desert-rock-resort-makes-progress-in-saudi-arabia/?outputType=amp

  3. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,108


    Sheybarah Resort, one of the most futuristic hotels on the planet, is due to open in 2024. One of the flagship properties at Saudi Arabia’s Red Sea gigaproject, it is set apart by its metal orb villas and entirely renewable energy usage
    Master developer Red Sea Global says it is ‘targeting’ to open the super resort in 2024. Earlier this month, the first batch of the eventual 73 overwater villas arrived at the archipelago tourism spot, a feat celebrated across the industry.
    Source: https://www.breakingtravelnews.com/news/article/space-age-sheybarah-resort-opens-in-2024-at-saudi-arabias-red-sea-project/

  4. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,018

  5. zeebefree is offline resortX Top Investigator
    Join Date
    Aug 2022
    Posts
    54
    Red Sea Global announced the first four projects opening during the first phase of 2023:

    1. Red Sea International Airport
    2. Six Senses Southern Dunes
    3. St. Regis Red Sea Resort
    4. Nujuma Ritz Carlton Reserve

    https://www.linkedin.com/posts/red-sea-global_redseaglobal-theredsea-activity-7016757538016636928-hGuG?utm_source=share&utm_medium=member_desktop

  6. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,108
    Red Sea Global starts 2023 with a new milestone as they welcome the very first batch of modularly-constructed villas for its Sheybarah Resort.
    Transported by heavy lifting and transportation company Mammoet, a total of four villas were shipped to the island to kick-start construction at the site. Mammoet won the contract to transport all 73 villa pods to the kingdom back in May 2022.





    Source: https://www.constructionweekonline.com/projects-tenders/the-red-sea-project-welcomes-its-first-batch-of-sheybarah-villas

  7. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,108
    Saudi Arabia’s PIF-owned Red Sea Global, a multi-project developer responsible for bringing The Red Sea Project and AMAALA to life, has revealed in its annual Sustainability Report that it awarded a total of 770 contracts for the construction of the gigaprojects.
    The company, led by CEO John Pagano who was featured in Construction Week Middle East’s Power 100 list, awarded these contracts to world-class companies from 29 countries. According to Red Sea Global, these contracts have a total value of $4.9 billion (SAR18.4 billion).


    Source: https://www.constructionweekonline.com/projects-tenders/saudi-red-sea-global-awarded-770-contracts-to-date-worth-4-9-billion

  8. ResortsAhoy is offline resortX Top Investigator
    Join Date
    Jul 2019
    Posts
    1,108


    Longi, one of the world's leading solar technology companies, said it has completed the delivery of 406MW of its bifacial Hi-MO 5 modules for Saudi Arabia's Red Sea Project, the world's most ambitious regenerative tourism project.


    Given the incorporation of the world's largest energy storage project currently under construction, it will have significant demonstration value once completed, serving as an important reference for future smart energy projects.

    Source: https://www.tradearabia.com/news/CONS_403834.html

  9. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,018

  10. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,018