Local Name:
جزيرة وصل
Budget:
$817M
Announced:
19 Mar 2017
Construction Start:
10 Jun 2019
Opening:
unknown
Area:
10 ha
Operator:
Contractors:
Ride Suppliers:
Other Suppliers:
  1. Vladislava is offline Curious Chap
    Join Date
    Nov 2023
    Posts
    2
    Local developer Wasl has awarded the estimated AED4.4bn ($1.2bn) contract to build The Island project in Dubai to Beijing-based China State Construction Engineering Corporation. The contract award is a significant moment for Dubai. According to regional projects tracker MEED Projects, it is the largest construction deal to be signed in the emirate since local contractor Alec secured the $1.36bn contract to build One Zabeel from local developer Ithra in 2017.
    Source: https://www.meed.com/chinese-firm-wins-largest-construction-contract-in-dubai-since-2017

  2. mrg
    mrg is offline resortX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,018

  3. In fact the tender has been issued three days ago.


  4. zeebefree is offline resortX Top Investigator
    Join Date
    Aug 2022
    Posts
    54
    Not much happened since May 2022. I got access to the site and it seems like they are still preparing most of the terrain and added some foundation structures. The security told me that tendering will start March 2023.






  5. From MGM International earnings call (August 3):

    in the U.A.E, we continue to make progress on bringing the MGM brand family to Dubai, where we have a management agreement for a nongaming integrated resort that has been developed in partnership with Wasl.

    The project has broken ground and work continues on the development progress, and we will watch with great interest what does or doesn't happen around gaming in the region, hopefully, in the near future.
    https://www.fool.com/earnings/call-transcripts/2022/08/03/mgm-resorts-international-mgm-q2-2022-earnings-cal/

  6. Ana
    Ana is offline resortX Top Investigator
    Join Date
    Jul 2022
    Posts
    30

  7. As the construction supervisor said the work is ongoing (pic 1). Lorries are leaving the site form time to time (pic 2). He also confirmed that the info on the board (at the entrance) is correct except for the 12/2021 date (pic 3). Even though it seems like there is nothing going on when we take a look at the construction from the outside (pic 4) we all know the truth now






  8. Mirage global offers a different picture of the completed Island by Wasl project to what was proposed earlier by Vice President and Prime minister of UAE and ruler of Dubai, Sheikh Mohammed bin Rashid Al Maktoum. The difference is in the centrical red circle structure. It is no longer on top of the central construction but positioned lower in between the surrounding hotel buildings. Also the color proposed is different. Now it's illustrated as blue, not red.

  9. mariannabazoidi is offline New User
    Join Date
    Jan 2022
    Posts
    1
    Current construction update: