Send your construction pics to uploads @ resortx.com

Search Results:

Type: Posts; User: ResortsAhoy

Page 1 of 5 1 2 3 4
  1. Thread: Grand Ho Tram Strip

    Post by: ResortsAhoy
    Posts
    14
    Views
    5,896
    Some photos from the construction on the retaining sea wall in front of the property and the new hotel tower.





    Source: https://www.instagram.com/angie.architect.traveler/
  2. Thread: Dubai Expo 2020

    Post by: ResortsAhoy
    Posts
    35
    Views
    5,370
    The Luxembourg Pavilion time lapse from August 2020





  3. Posts
    26
    Views
    3,435


    In some of these shots you can see construction on the other Islands, otherwise the whole place just looks desolate!



    Source: https://www.instagram.com/p/CFbfpjuhB1f/
  4. Posts
    38
    Views
    12,202
    Dubai mega project reaches construction landmark with bridge installation.





    Construction on a Dubai mega project has reached a milestone as a 7,700-tonne bridge is lifted into place at One Zaabeel. The 192-metre long first section of the steel structure, known as The Link, was lifted 100 metres into the air to begin bringing together the two buildings.
    On Thursday, developer Ithra Dubai said the section took 12 days to lift into place. More than 110 jacks and heavy-duty strand jacks were used for the operation, calling for a concerted effort by a team of experts in construction, engineering and contracting.

    The first section of the Link is now in its final position. The second lift of 816 tonnes is scheduled for October and will complete the Link to reach its final length of 226 metres.
    Source: https://www.thenational.ae/uae/dubai-mega-project-reaches-construction-landmark-with-bridge-installation-1.1072515#5
  5. Thread: Star Wars Resort

    Post by: ResortsAhoy
    Posts
    27
    Views
    8,516
  6. Posts
    7
    Views
    1,244
    Somehow looking like it's going backwards in construction.



    Source: https://twitter.com/bioreconstruct/status/1307586907283623939/photo/1
  7. Posts
    50
    Views
    15,515




    Cool time-lapse of the property and announcement that the last tower crane came down at the end of August, everything is now internal and fit out.

    Source: https://www.instagram.com/p/CEqXPtcBRyh/
  8. Posts
    17
    Views
    2,269






  9. Posts
    50
    Views
    15,515
  10. Posts
    12
    Views
    3,543
    More inside concept art for the villas







    and also some outdoor concept art for winter months



    Source: https://wemp.app/posts/8e46ae9c-6a51-4e4b-9278-b7e7dd5bd436
  11. Thread: Dubai Expo 2020

    Post by: ResortsAhoy
    Posts
    35
    Views
    5,370




  12. Posts
    50
    Views
    15,515
    Screen being tested this week.



    Source: https://twitter.com/VitalVegas/status/1302680188711350277
  13. Thread: Star Wars Resort

    Post by: ResortsAhoy
    Posts
    27
    Views
    8,516
    Aerial overview of Star Wars Galactic Starcruiser (hotel). Decks of the ship are in the large show building. Cabins aboard ship are in the slender building at left. It's unclear what the openings are for, as the cabins are said to have windows out into space, viewing Batuu.


    Source: https://twitter.com/bioreconstruct/status/1303059493668950017
  14. Posts
    12
    Views
    3,543
    I found some new images but to see the whole article I need to be a Chinese citizen to register, requires a Chinese phone number / WeChat account. Could anyone follow up and see if you can find the rest of the images?

    The hotel buildings looks like it's quite far into construction from what I could see.







    Source: https://ptf.flyert.com/forum/2020/08/14/155134cwmlfjiglwqqbssi.jpg
  15. Posts
    38
    Views
    12,202
    Restaurant and glamping pod plans given go-ahead at new Edinburgh Wavegarden - Scotland's first artificial surf park


    Scotland’s first artificial surf park – to be created near Ratho – will feature a string of additional features to help it boost the local economy by up to £11 million per year.

    Wavegarden’s developers, Tartan Leisure Ltd, were yesterday given the go-ahead to press on with their plans after submitting a fresh application to Edinburgh City Council.And they have been given the thumb-up to build overnight accommodation at the development and its HUB complex which will provide food, retail, changing and leisure facilities.


    The new planning permission gives the green light for the HUB, with facilities including a restaurant, retail outlet, a surf school, a wellness spa, a café and a number of viewing terraces and an observation deck, overlooking the park. Set within a 60-acre country park, the waterside accommodation will cater for all needs, including school groups, family groups and international surfers, through luxury lodges, glamping pods, accessible “wave pods”, bothies and canal berths.
    Source: https://www.edinburghnews.scotsman.com/business/restaurant-and-glamping-pod-plans-given-go-ahead-new-edinburgh-wavegarden-scotlands-first-artificial-surf-park-2940815
  16. Posts
    17
    Views
    5,425
    Construction seems to be progressing well over the last month.









    Source: https://www.facebook.com/theritzcarltonresidencesparadisevalley
  17. Posts
    38
    Views
    12,202


    Property developer Hatten Land Ltd recently found a white knight in Singapore-based hospitality and investment firm Tayrona Capital Pte Ltd to revive its stalled RM2.2 billion Harbour City mixed develop*ment in Melaka.
    Spanning six acres, Harbour City is a marine-themed development on the reclaimed island of Pulau Melaka, fronting the Straits of Melaka. It comprises a water theme park, touted to be the largest in Melaka when completed, as well as a mall and three hotel blocks. The highly anticipated project was launched in 2015 and slated to be completed in the second quarter of 2020. Construction of the project has screeched to a halt, however, owing to a dispute with its main contractor.
    Even with the completion of Harbour City, it may face the challenge of drawing in visitors. As with most large-scale developments in second-tier cities, property experts The Edge spoke to expressed concern over the viability of the sizeable Harbour City project in sleepy Melaka. They believe its local catchment of below one million would not justify the amount being invested in the project.
    Source: https://www.theedgemarkets.com/article/singapore-firm-rescue-hatten-lands-mega-project-melaka
  18. Thread: Dubai Expo 2020

    Post by: ResortsAhoy
    Posts
    35
    Views
    5,370
    Time-lapse of the Dutch Pavilion from July/August. There doesn't seem to be a huge amount of work ongoing and I am hearing rumours that a lot of construction work has been stopped and contracts dropped. Anyone know if these rumours are true?



  19. Posts
    26
    Views
    3,435
    Video of the resort model from the investment suite.



    source: https://www.instagram.com/p/CCku3qsBNz0/
  20. Posts
    38
    Views
    12,202
    It looks like the integrated resort (IR) that was out for tender for Osaka is having more delays and doubts thrown at it. The Genting Group have already walked away from the project leaving MGM as the main bidder to create the resort.

    MGM President and CEO Bill Hornbuckle revealed that his firm was not committed to moving forward with its multi-billion dollar IR investment at Yumeshima, Osaka.
    He also made the oblique but perhaps meaningful comment: “We like the fact that there’s probably going to be a delay in the reopening of some of the conversations that will hopefully make this a better investment for anybody interested in it, most notably us.”


    Source: https://agbrief.com/headline/mgm-not-committed-to-osaka-ir-investment/#:~:text=In%20an%20earnings%20conference%20call,IR%20investment%20at%20Yumeshima%2C%20Osaka.
  21. Posts
    26
    Views
    3,435
    Video of the seahorse floating homes.



    Source: https://www.instagram.com/p/CEKH-XdDphp/
  22. Thread: Star Wars Resort

    Post by: ResortsAhoy
    Posts
    27
    Views
    8,516
    Aerial overview of Star Wars Galactic Starcruiser (hotel). Work continues on forming small hills where a forest will block guest views of the building. Guests to see only the Porte Cochère.

    Cabins in the back. Decks of the ship in the large square portion.

    Source: https://twitter.com/bioreconstruct/status/1294919478422233088


    Source: https://twitter.com/bioreconstruct/status/1294942902599196672


    Source https://twitter.com/bioreconstruct/status/1294923029898825729


    Source: https://twitter.com/bioreconstruct/status/1294922083538001920
  23. Thread: Dubai Expo 2020

    Post by: ResortsAhoy
    Posts
    35
    Views
    5,370


    Testing the projection mapping on the domes.



  24. Posts
    7
    Views
    1,244
    No movement on construction, looks like this one will end up in the limbo/fail section sadly.



    Source: https://twitter.com/bioreconstruct/status/1294914377162862593/photo/1
  25. Posts
    27
    Views
    4,132
    I agree, concept art is really just to give a feel rather than specification for what will be delivered.

    Those to me look like giant frogs (note the extended legs/feet) and are to fit with the animal theming for the whole resort. I believe that space is just meant to feel like you're underwater and you would have to wait for the actual design to come out to see what it actually turned out to be.
Results 1 to 25 of 120
Page 1 of 5 1 2 3 4