    NEOM is real part 24
    A good snap shot of progress and a range of NEOM projects that are going well and shows things from a very different view point.







    Source: https://www.linkedin.com/posts/giles-pendleton-frics-b83856101_neom-activity-7317181694006956033-DTwe/?utm_source=share&utm_medium=member_desktop&rcm=ACoAAAAvc9UB1jA15FR73YhKZxjtleXeHg9SDX4


  2. Piling work has almost been completed on a marina section of the Line – Neom’s 170km long futuristic linear city that will extend from Saudi Arabia’s Red Sea coast inland.


    Source: https://www.geplus.co.uk/news/neom-piling-progresses-on-the-lines-marina-20-03-2025/

  3. Another milestone in innovation at NEOM’s Design and Construction sector!
    We’re thrilled to showcase HIPER Pile at the Innovation Hub – a ground breaking pile foundation solution developed through collaboration between City University and Keltbray in the UK. HIPER stands for Hollow Impression Enhanced Pre-cast, Energy storage and generation, and Re-use.
    This award-winning solution was implemented as a proof-of-concept designed specifically for THE LINE project. The 1.2m diameter precast concrete piles were manufactured and shipped in 10m segments, then bolted and installed onsite to form 50m deep piles, tested to 50MN compression loading. The setup included 14 reaction piles supporting an impressive test frame to generate the significant compression load.








    Source: https://www.linkedin.com/posts/hussam-nasreddin-79645532_innovation-sustainability-construction-activity-7303381463075291139-PDCa?utm_source=share&utm_medium=member_desktop&rcm=ACoAAA4wwmUB15BzsdndvY3Im6npf6gt5SHkjJ8

  4. BurningSky is offline resortX Top Investigator
    Join Date
    Jul 2023
    Posts
    248
    Welcome to the JUNGLE of Piling RIGS, where you will find giant Piling RIGS from Different manufacturers. This is why the NEOM-The Line project is the world's largest project. With these rigs, we can easily drill more than 90m depth and a diameter of 2500mm piles, which we are doing smoothly with our strategic plan, Proper Planning, and the Experienced Team & making the project to a reality.




    Source: https://www.linkedin.com/feed/update/urn:li:activity:7305096106839814144/

  5. HunterX is offline resortX Top Investigator
    Join Date
    Aug 2022
    Posts
    239
    During an exclusive first-ever media tour of Saudi Arabia’s THE LINE, Al Arabiya English witnessed the massive construction of this groundbreaking urban project at the heart of NEOM.

    Speaking to Al Arabiya English, COO Giles Pendleton dismissed speculation of a scale-back, affirming that THE LINE will be delivered in planned phases.










  6. A huge thank you to my good friend HRH Prince Fahad M AlSaud for leading such a high-quality delegation of Saudi founders and investors to NEOM. Connecting NEOM with the best Saudi startups, technologies, and investors is a top priority as we build the innovation economy here, and this visit was an important step in that journey.

    To truly collaborate, these founders need to see what we’re building, how we’re building it, and the problems we’re solving. That’s why we wanted to bring 30 key players from the Saudi startup ecosystem for a tour of NEOM’s sites and discussions with leaders across various Sectors & Regions.

    From witnessing the latest groundbreaking (literally) progress at The Line, observing the fast-growing biodiversity at Menifa Nature Reserve, and exploring the impressive Bajdah Desert Studios, the visit showcased the many opportunities for entrepreneurs to help us combine innovation with sustainability.


    Source: https://www.linkedin.com/posts/wyattroy_neom-entrepreneurship-innovation-ugcPost-7300040431835197441-tJRu/?utm_source=share&utm_medium=member_desktop&rcm=ACoAAAAvc9UB1jA15FR73YhKZxjtleXeHg9SDX4

  7. HunterX is offline resortX Top Investigator
    Join Date
    Aug 2022
    Posts
    239
    It's another beautiful day at the NEOM site. The new piling area is getting ready. Very soon, we will start the 90m depth and 2500 mm diameter of piles. The site preparation is underway and almost done.








    Source: https://www.linkedin.com/posts/rukon-uddin_neom-theline-neomtheline-activity-7299650378520764416-diQU/

  8. NewMansLand is offline Resort Investigator
    Join Date
    Feb 2025
    Posts
    6
    When driving from Tabuk to NEOM Bay Airport, you'll actually cross The Line:


    But not much to see yet on this section: